<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cleantech Machines</title>
    <link>https://cleantechmachines.com/</link>
    <description>Essays on clean energy hardware: manufacturing scale-up and factory economics, grid interconnection queues, storage duration versus power, and how process engineering rather than invention drives cost curves.</description>
    <language>en</language>
    <atom:link href="https://cleantechmachines.com/feed.xml" rel="self" type="application/rss+xml"/>
    <item>
      <title>Cost Curves Are Built, Not Discovered</title>
      <link>https://cleantechmachines.com/cost-curves-are-built-not-discovered/</link>
      <guid isPermaLink="true">https://cleantechmachines.com/cost-curves-are-built-not-discovered/</guid>
      <pubDate>Tue, 28 Jul 2026 00:00:00 +0000</pubDate>
      <category>Economics</category>
      <description>The decline in clean energy hardware costs is an accumulation of process engineering — material removal, step elimination, throughput, yield, standardisation — not a sequence of breakthroughs. Which is why some technologies learn quickly and others never do.</description>
    </item>
    <item>
      <title>Duration Is Not Power</title>
      <link>https://cleantechmachines.com/duration-is-not-power/</link>
      <guid isPermaLink="true">https://cleantechmachines.com/duration-is-not-power/</guid>
      <pubDate>Thu, 09 Jul 2026 00:00:00 +0000</pubDate>
      <category>Storage</category>
      <description>A storage asset has two independent ratings and they are bought from different suppliers. Why the split between megawatts and megawatt-hours decides which services an installation can sell, and which it only appears to.</description>
    </item>
    <item>
      <title>Everything Waits for the Interconnection</title>
      <link>https://cleantechmachines.com/everything-waits-for-the-interconnection/</link>
      <guid isPermaLink="true">https://cleantechmachines.com/everything-waits-for-the-interconnection/</guid>
      <pubDate>Mon, 22 Jun 2026 00:00:00 +0000</pubDate>
      <category>Grid</category>
      <description>Why connecting a finished generator to the grid takes longer than building it — the sequential study problem, speculative queue entries, upgrade cost allocation, and the withdrawal cascades they produce.</description>
    </item>
    <item>
      <title>The Factory Is the Technology</title>
      <link>https://cleantechmachines.com/the-factory-is-the-technology/</link>
      <guid isPermaLink="true">https://cleantechmachines.com/the-factory-is-the-technology/</guid>
      <pubDate>Fri, 05 Jun 2026 00:00:00 +0000</pubDate>
      <category>Manufacturing</category>
      <description>A working device and a manufacturable product are separate inventions, and the second one takes longer. Why scale-up, not discovery, is where clean energy hardware actually gets stuck.</description>
    </item>
  </channel>
</rss>
